Envíos en un día, libros seleccionados  Ver más

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Final Environmental Assessment for the Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois (Site 1), and Hazle Tow (en Inglés)
Formato
Libro Físico
Idioma
Inglés
N° páginas
178
Encuadernación
Tapa Blanda
Dimensiones
27.9 x 21.6 x 1.0 cm
Peso
0.43 kg.
ISBN13
9781482553611

Final Environmental Assessment for the Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois (Site 1), and Hazle Tow (en Inglés)

National Energy Technology Laboratory (Autor) · Createspace Independent Publishing Platform · Tapa Blanda

Final Environmental Assessment for the Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois (Site 1), and Hazle Tow (en Inglés) - Laboratory, National Energy Technology ; Energy, U. S. Department of

Libro Nuevo

$ 32.72

$ 65.43

Ahorras: $ 32.72

50% descuento
  • Estado: Nuevo
  • Quedan 75 unidades
Origen: Estados Unidos (Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el Viernes 19 de Julio y el Martes 30 de Julio.
Lo recibirás en cualquier lugar de Ecuador entre 1 y 3 días hábiles luego del envío.

Reseña del libro "Final Environmental Assessment for the Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois (Site 1), and Hazle Tow (en Inglés)"

DOE prepared this EA to evaluate the potential environmental consequences of providing a financial assistance grant under the American Recovery and Reinvestment Act of 2009 in a cooperative agreement with the Beacon Power Corporation (Beacon Power) as part of the Smart Grid Demonstrations Program. This EA evaluates two similar proposed projects in two locations: Site 1 evaluates installation of a utility-scale 20-megawatt flywheel energy storage and frequency regulation plant in Chicago Heights, Illinois, to provide frequency regulation services to PJM Interconnection, the electrical grid operator. The cost of the proposed project at the Illinois location would be about $48.1 million. Site 2 evaluates installation of the same system in Hazle Township, Pennsylvania. The cost of the proposed project at the Pennsylvania location would be about $53 million. DOE could choose to provide a grant for either location. DOE's Proposed Action would provide approximately $24 million in financial assistance in a cost-sharing arrangement to Beacon Power. In addition, for the proposed project in Pennsylvania (Site 2), Beacon Power could receive a $5 million grant from Pennsylvania's Redevelopment Capital Assistance Program. This EA evaluates the environmental resource areas DOE commonly addresses in its EAs and identifies no significant adverse environmental impacts for the proposed project. The proposed projects could result in beneficial impacts to the nation's energy efficiency and the local economy, and could contribute to a minor reduction of greenhouse gases.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes